"NDC Construction" ltd made important values of Road Building works, during his exist. The society is equipped with necessary mountings for drilling-explosion works, more info
The building of Trans Caucasus’ railway Arxoti tunnel which is crossing the main mountain range of Caucasus was one of the most unique in the practice of tunnel building. The length of tunnel was 23690 longitudinal m, transversal section – 110 m2, the absolute mark of entrance front door above sea level was – 1400 m.
more info
The Society realized with its force collectors and conducts restoration of Bogvi, Fartsxisi and Telovani lend-reclamation irrigation systems, in hard economical and power crisis conditions. more info
The Society realized with its force collectors and conducts restoration of Bogvi, Fartsxisi and Telovani lend-reclamation irrigation systems, in hard economical and power crisis conditions. more info